7.5MW Turn-key ASIC Immersion Mining Site in South Zone ERCOT (Texas) All high end systems, business components, and physical assets are included. Built out to the highest degree of standards in terms of processes, systems, infrastructure, and experienced personnel. Excellent load distribution with minimal transmission distance. The power rate comes in at 2.96c/kWh - 3.5c/kWh by utilizing the full benefit that a good curtailment strategy, ancillary services, credits, riders, and program participation bring in. The 5.2 acre developed site with $7,500/month land lease is prime for further expansion with easy additional 5 acre acquisition, 20MW added capacity approved for study, and adjacent to a large battery bank. Turnkey Systems & Infrastructure: - 3 x Immersion Cooling Systems (1.5MW, 1MW, 500KW) to Host 1,032 Miners - 914 Efficient Bitmain S19K Pro Miners Under Warranty and S19J Pro - 3 x 3000kVA GE Prolec Transformers (7.5MW Energized, 2 for Mining) - 480V/415V Transformer for Utility Container - 415V/120V Transformer for Offices/Camp - Robust Electrical with Redundancies - Managed Switches, Telemetry - Perimeter Security with Cameras, Gating, 5G Monitoring - Offices, Storage, Tools/Spares - True Manufacturing-Grade Operations Energy/Site Build: - 7.5MW Fully Developed Site - Permits, Roads, Trenched Cabling - Excellent Load Distribution - Minimal Transmission Distance - 20MW Expansion Study Approved - 27.5MW Total Potential - Power Rate at 2.96c/kWh - 3.5c/kWh - Utilizing the Full Benefits that ERCOT Brings In Electrical & Monitoring: - Robust Electrical with Redundancies - Managed Switches for Complete Control - Advanced Telemetry - Individual Transformer Monitoring - Integration with Retail Energy Provider Dashboard Additional Assets: - Permits, Roadways, Trenched Cabling, Easements - Excellent Load Distribution - Minimal Transmission Distance - 20' Office Container with Air Conditioning - 40' Storage Container - Security - Perimeter Fencing, Cameras, 5G Monitoring Energy Economics: - Optimal Power Rate in ERCOT South Zone - Optimization for 2.96c/kWh - 3.5c/kWh with Curtailment, Ancillaries, Credits - Millions in Annual Savings vs Other Markets - Participate in One of the Most Robust, Consumer Incentivized, Miner friendly Energy Markets in the World Expansion Potential: - 20MW Additional Expansion Approved for Study - Space and Infrastructure to Scale Operations - Large Value Add Potential for New Owner Due to Expansion Potential Key Value-Adds: - 700 ePic Blockchain UMC Control Boards with Zero Dev Fee Firmware - AI Pro (Bitcoin-Focused) Installed Entire Network System - 4/0 Redundant High Voltage Cabling Trenched - Minimal Distance to Transmission Infrastructure - Operations-Hardened Setup - Manufacturing-Grade Financials: -Land Lease for 5.2 acres: 7,500 per month -Purchase price: 6.5MM Scott Bullard - Apogee West LLC - Montana, USA - HPC/GPU, Multi-MW Mining Site Sales & Development, Bulk Mining Hardware Acquisitions [link] [comments] |
You can get bonuses upto $100 FREE BONUS when you:
π° Install these recommended apps:
π² SocialGood - 100% Crypto Back on Everyday Shopping
π² xPortal - The DeFi For The Next Billion
π² CryptoTab Browser - Lightweight, fast, and ready to mine!
π° Register on these recommended exchanges:
π‘ Binanceπ‘ Bitfinexπ‘ Bitmartπ‘ Bittrexπ‘ Bitget
π‘ CoinExπ‘ Crypto.comπ‘ Gate.ioπ‘ Huobiπ‘ Kucoin.
Comments